Master'sOpen Access

Determination of risks encountered in the construction and operation of treatment plants and implementation of different risk assesment methods

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2019
0 views
0 downloads

Abstract (EN)

Within the scope of the thesis, the existing risks within the Tahtalı (Görece) Drinking Water Treatment Plant, which obtains drinking water from the Tahtalı Dam, which is the largest surface water source of Izmir, have been identified and the risk assessment methods have been applied integrally in terms of process and environment working conditions. In terms of process, HAZOP method was used, pressure and flow parameters were evaluated. In terms of environment and working conditions, FINE - KINNEY method was used and many dangerous factors such as lifting tools, welding works, electrical works, working with chemicals, working at height, working indoors, laboratory works, chlorination barrel storage and filter press equipment were evaluated. This integrated work has brought maximum benefit in terms of identifying and eliminating risks, and an action guide has been put forward including the measures to be taken to facilitate the establishment of healthy and safe working environments.

Author

Salih Deniz Islakoğlu

How to Cite

Salih Deniz Islakoğlu (Master Thesis). Determination of risks encountered in the construction and operation of treatment plants and implementation of different risk assesment methods, 2019, Ege University.

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Ege University