Developing a new production inventory model with multiple products and multiple constraints and a new solution method
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this thesis a fuzzy production inventory model with multiple products and multiple fuzzy constraints has been created and it is aimed to seek a solution for cost minimization problems in production industry.Additional to unconstrained optimization problem, some constraints have been added. These constraints are warehouse capacity, production capacity and budget. Total production cost is calculated to minimize under these constraints.The constraints are chosen by considering the priorities of production companies and thus integrated to the model.For the solution of the problem a method has been evaluated which will provide ease and efficiency to companies. With this evaluation it has been decided to use Lagrange multipliers which is rarely applied to optimization problems, but which is also an efficient tool and method.The model has been solved with Lagrange multipliers method and then in parallel the solution has been reached by a Matlab program.In this way, it has been seen that Lagrange multipliers can also be applied efficiently to optimization problems.After finding the solution for the crisp model, the model has been converted to a fuzzy model by fuzzying the total cost formula and the constraints. This fuzzy model has been solved by a Matlab program and thus the optimal solution has been reached.The results of the crisp and fuzzy models have been evaluated at the end.With this thesis, a new economic order quantity model has been developed and thus a new approach has been presented in the academic area.Anahtar kelimeler: Production Inventory Model, Fuzzy Logic, Lagrange, Zimmermann, Optimization, Economic Order Quantity
Author
Doğan Hasan
Institution
How to Cite
Doğan Hasan (Doctorate thesis). Developing a new production inventory model with multiple products and multiple constraints and a new solution method, 2008, Yıldız Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Yıldız Technical University
- Obtaining gold from one cyanide leaching method, enviromental problems and examples of Turkey (gold production in view Turkey)(2007)
- A ruled-based software model in the preliminary design phase of housing: Example of Mardin(2008)
- 19th-20th centuries apartment buildings in Şişli and Osmanbey(2001)
- An investigation on the relationship between problem solving and critical thinking skill, and academic achievement of vocational and technical high school students(2017)
- Numerical investigation of single bubble flow boiling both on a flat surface and on a cavity in horizontal pipe and pool boiling on a flat surface(2018)
- Examination of the categories in which buildings with LEED v3 and v4 certificates score the lowest points in Turkey(2018)
