Master'sOpen Access

Productivity analysis of the mining machinery utilized for overburden stripping at Bursa Lignite Corporation

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2007
0 views
0 downloads

Abstract (EN)

In this work, the productivity analysis carried out on the loading and excavating machinery used for earth moving at Bursa Lignite Corporation was outlined. For this analysis, the mining machinery was handled both individually and in total and the results obtained were evaluated accordingly. In order to realize the work in concern, productivity, productivity rate and machinery productivity indices were calculated employing the production values of the machinery for the year 2005 together with the working and stoppage hours. With the assistance of the results acquired, working performances of the overburden excavation machinery were evaluated. Key words: Analysis of productuvity, productuvity, efficiency

Author

Mehmet Taşer

How to Cite

Mehmet Taşer (Master Thesis). Productivity analysis of the mining machinery utilized for overburden stripping at Bursa Lignite Corporation, 2007, Kütahya Dumlupınar University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Kütahya Dumlupınar University