Productivity analysis of the mining machinery utilized for overburden stripping at Bursa Lignite Corporation
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this work, the productivity analysis carried out on the loading and excavating machinery used for earth moving at Bursa Lignite Corporation was outlined. For this analysis, the mining machinery was handled both individually and in total and the results obtained were evaluated accordingly. In order to realize the work in concern, productivity, productivity rate and machinery productivity indices were calculated employing the production values of the machinery for the year 2005 together with the working and stoppage hours. With the assistance of the results acquired, working performances of the overburden excavation machinery were evaluated. Key words: Analysis of productuvity, productuvity, efficiency
Author
Mehmet Taşer
How to Cite
Mehmet Taşer (Master Thesis). Productivity analysis of the mining machinery utilized for overburden stripping at Bursa Lignite Corporation, 2007, Kütahya Dumlupınar University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Kütahya Dumlupınar University
- Comparision of the leg and ARM CYCLE ergometer exercises in terms of the effects on physical and psychological functions in patients with undergoing coronary arter bypass surgery(2016)
- The production and characterization of zirconia-zirconium diboride (ZrO2-ZrB2) composites for structural applications(2016)
- The reflections of government grants on renewable energy sector in Turkey(2016)
- The analysis of regulation and supervision agencies' budget structures in Turkey: Banking Regulation and Supervision Agency sample (2005 - 2014 Period)(2016)
- Choised based conjoint analysis and an application(2016)
- Development of sepiolite doped materials in cement mortar adhesive(2016)