Commissioning of wastewater treatment plants and evaluation of different stages of options
2009
0 views
0 downloads
Advisor: Prof. Dr. Ayşe Filibeli
Abstract (EN)
In this study commissioning period is examined with the examples. Actions before andduring commissioning are examined with examples to give the view points to theengineers. The solutions for the possible problems are that may happen duringcommissioning are given.Compact plant is analyzed with different treatment options. These are carbon removal,carbon removal with nitrification, carbon removal with nitrification plus denitrification andextended aeration. The oxygen consumptions, sludge productions, necessary adjustmentsover the process and treatment efficiencies of the wastewater treatment plant are examinedaccording to the German rules and standards for activated sludge plants. All the parametersfor each process are calculated and summarized. Different treatment options are comparedto each other and liability of each options for the typical wastewater treatment plant isexamined.
Author
Dr. Erol Bölek
Institution
How to Cite
Erol Bölek (Master Thesis). Commissioning of wastewater treatment plants and evaluation of different stages of options, 2009, Dokuz Eylül University, Çevre Mühendisliği Bölümü.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Dokuz Eylül University
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- Hittite period ceremonial ceramic vessels and current applications(2023)
- The thoughts and practises of Atatürk's adopted daughter Afet İnan(2018)
- Local dependence measures, properties and applications(2007)
- Jurisprudential sanction and influence of Turkish constitutional courts decisions given as a result of norm controlling(2001)
- The Evaluation of treatment costs of childhood cancers(1997)