Commissioning of wastewater treatment plants and evaluation of different stages of options
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this study commissioning period is examined with the examples. Actions before andduring commissioning are examined with examples to give the view points to theengineers. The solutions for the possible problems are that may happen duringcommissioning are given.Compact plant is analyzed with different treatment options. These are carbon removal,carbon removal with nitrification, carbon removal with nitrification plus denitrification andextended aeration. The oxygen consumptions, sludge productions, necessary adjustmentsover the process and treatment efficiencies of the wastewater treatment plant are examinedaccording to the German rules and standards for activated sludge plants. All the parametersfor each process are calculated and summarized. Different treatment options are comparedto each other and liability of each options for the typical wastewater treatment plant isexamined.
Author
Erol Bölek
Institution
How to Cite
Erol Bölek (Master Thesis). Commissioning of wastewater treatment plants and evaluation of different stages of options, 2009, Dokuz Eylül University, Çevre Mühendisliği Bölümü.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Dokuz Eylül University
- Analysis of speech clarity parameters in open plans offices(2021)
- The characteristic of rural architectural heritage and the conservation problem in Urla region(2019)
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- New suggestions regarding the technical problems encountered by proffessional vocal artists in voice production(2012)
- Examination of martian habitats from the viewpoint ofstructure(2022)
- Environmental graphic design and public installation in the context of 21st century postmodernism(2022)