Planning of EUAS Seyitömer Lignites Company S-49 panel with a use of computer program
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Mining is requires large investments and is an operation that carries big risks. Before considering such an operation one must know the form of the ultimate surfaces and the amount to mine for having a beneficial operation. The aim of this study is most of the mining companies will be available in the future, which is also used by surpac program application of Seyitömer Lignite Business S-49 Board to connected. This study includes evaluation of drilling data, 3-D (three dimension) design of seam, the reserve estimation, creating the contour of seam, the beach design with three dimensions.
Author
Mehmet Çakmak
Institution
How to Cite
Mehmet Çakmak (Master Thesis). Planning of EUAS Seyitömer Lignites Company S-49 panel with a use of computer program, 2015, Dokuz Eylül University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Dokuz Eylül University
- Analysis of speech clarity parameters in open plans offices(2021)
- The characteristic of rural architectural heritage and the conservation problem in Urla region(2019)
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- Examination of martian habitats from the viewpoint ofstructure(2022)
- Environmental graphic design and public installation in the context of 21st century postmodernism(2022)
- Critics against Muawiyah ibn Abi Sufyan(2019)
