Master'sOpen Access

Eveluation of loading parameters for electrical excavators working in western lignite enterprise utilizing the method of statistical proces control

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2006
0 views
0 downloads

Abstract (EN)

In this study, the electrical ekscavators working in open pits of Western LigniteEnterprise to determine whether loading parameters is under control or not. Fort this purpose,the process stability and capability of the overburden trucks with the payload of 170 shorttonnes capacity were investigated for the year 2005. Proces stability analysis was carried out bytaking the average and the range control charts. Proces capability analysis was also realized byconsidering capability indexesIn 2005, the loading parameters of electrical excavators were found to be instable andincapable in comparison with the year 2006. Some works were realized in order to make theprocess stable and capable. Therefore, all mine workers were taken under the education processtwice.Key Words: Control Chart, Method of Statistical Process Control, Process Capability, ProcessCapability Indexes, Process Stability

Author

Ayhan Sezgin

How to Cite

Ayhan Sezgin (Master Thesis). Eveluation of loading parameters for electrical excavators working in western lignite enterprise utilizing the method of statistical proces control, 2006, Kütahya Dumlupınar University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Kütahya Dumlupınar University