Construction project management: At application on a dam and hydroelectric power plant project
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
A project is a planned undertaking of related activities to reach an objectivethat has time and resource constraints. Although all projects have somecommon properties, construction projects differ from others. External factorsplay a great role on construction projects so risk and uncertainty are high onthese projects. Construction project managers must evaluate differentalternatives of technology, workmen and equipment. They also must considerweather conditions, loss of supplies, issues of workmen, unknown undergroundconditions and incorrect time and cost estimations. Projects were small in thepast that a manager could manage all the details with his knowledge andexperience but neccessities have increased and building techniques havedeveloped with time. As a result more complex projects have occured. Afterthis process, controling the details have become difficult for project managersand it has been a necessity to use project management techniques. In this study,a Dam and Hydroelectric Power Plant project which has being constructed foryears, has been programmed by using PERT and CPM techniques. Theprogramme which gives the best result has been choosen from differentalternatives and a new programme has been formed for the activities that havebeen incomplete.viScience Code : 810Key Words : Project Management, Construction, Programming TechniquesPage Number : 135Adviser : Prof. Dr. Berna DENGİZ
Author
Deniz Dinç
How to Cite
Deniz Dinç (Master Thesis). Construction project management: At application on a dam and hydroelectric power plant project, 2005, Gazi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gazi University
- Experimental development of the interfacial bond-slip model between textile reinforced mortar strips and masonry walls(2025)
- Occupational accident analysis and modelling in oil and gas drilling sector Turkey(2021)
- The ideological construction of regime debate in Turkey by the press in the context of 2007 presidential elections(2012)
- XVI. yüzyıl Anadolu'sunda Oğuzların Karkın Boyu(2004)
- Sharing of real life geometry samples via a social learning environment: A case study(2021)
- The use of verbal memory in the context of sustainability and power at the museums of Turk(2010)