Risk assessment of kargi hydropower plant project tunnel related occupational health and safety
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In the improving Technologies tunnelling works gets faster in energy and transportation field. As known construction and mining works can be accepted as the most dangerous profession. Tunnelling works are the combination of mining and construction which can be classified as most hazardous works. In this study risks assessed of Kargı Hydropower Plant Tunnel construction and possible risks are evaluated. L Type Matrix used for risk assessment. Precautions defined about risks and hazard management.
Author
Ahmet Yılmaz
Institution
How to Cite
Ahmet Yılmaz (Master Thesis). Risk assessment of kargi hydropower plant project tunnel related occupational health and safety, 2019, Çukurova University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- An investigation of violent and nonviolent adolescent' families in terms in terms of family fuctioning, anger and anger expression(2006)
- Adolescents who have single parents family and full family were compared in respect to their life satisfaction and quality of life(2009)
- Assessing morphological and genetic diversity among traditional African eggplant landraces and detecting salt tolerance and anther culture performance of selected accessions(2022)
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Cultural significance in foreign learning and teaching with special emphasis on reading comprehension through cultural schemata(1992)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
