Master'sOpen Access

Chrome ore production and preparation gallery construction risk assessment

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2023
0 views
0 downloads

Abstract (EN)

In the study, the probability and effects of the occurrence of hazards were examined in detail with the L type 5×5 Matrix method according to the hazard factors determined in the chrome quarries in the Guleman region of Elazig, and the determinations were revealed. Preventive activities have been planned to reduce the hazards identified within the scope of field studies and the risks they will cause. Although it is not possible to completely eliminate the danger and risk with these assessments, the reduction of the risk can be achieved with the applied control systems. The main purpose of these measures is to protect the body health of the working personnel against possible occupational accidents and occupational diseases. In the risk analysis carried out within the scope of the study, the risk was reduced to minimum levels and the hazards, possibilities, improvements and results were given in detail in the risk assessment chart. Within the scope of this study, in the risk assessment analysis of the quarry, the building and annexes, workshop and construction site, underground mining works, loading and transportation, psychosocial risk factors, construction machinery and equipment, electricity, emergency, environmental factor and epidemic disease measures were determined by dividing into sections. The risks and the precautions to be taken are discussed in detail. High risks of 51 out of 192 in the enterprise are reduced to an acceptable level with necessary regulations. Our aim in this study is to reduce the risks to an acceptable level with the necessary measures in the risk assessment analysis made to eliminate the risks and work accidents that may occur in the chrome quarry sector, and it is aimed that the personnel work in a more reliable environment.

Author

Güven Çağlar

How to Cite

Güven Çağlar (Master Thesis). Chrome ore production and preparation gallery construction risk assessment, 2023, Kütahya Dumlupınar University.

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Kütahya Dumlupınar University