Master'sOpen Access

Mesudiye (Ordu) state road (Km: 18+000 - 18+360) geotechnical investigation and stability analysis of reinforced earth walls

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2024
0 views
0 downloads

Abstract (EN)

In this study, geotechnical investigation and stability analysis of the strip reinforced earth retaining wall constructed on the left side between T2 Ilisar Tunnel and T3 Mesudiye Tunnels on Gölköy-Topçam Separation Mesudiye State Road (Km: 18+000 - 18+360) within the borders of Ordu province were carried out. The wall in question is located on the left side of the route; the length of the wall is 370 m and the height of the wall is 30 m. Considering the data obtained within the scope of the study, based on the analysis of the project under study, the design of a palletized reinforced earth retaining structure, which is considered to be under the influence of traffic loads, was studied. As a first step, the design behavior for the existing geotechnical conditions was investigated. The lane length and density data obtained from the internal and external stability investigations were used in PLAXIS software for calculations over a width of 1m. Vertical and horizontal displacements and tensile forces on the reinforcement strips were measured. It was determined that these displacements and forces were within acceptable limits.

Author

Ümit Eke

How to Cite

Ümit Eke (Master Thesis). Mesudiye (Ordu) state road (Km: 18+000 - 18+360) geotechnical investigation and stability analysis of reinforced earth walls, 2024, Çukurova University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Çukurova University