Multi-purpose scheduling on parallel machines under breakdown
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Planning and scheduling techniques have been discussed which are used nowadays by explaining planning and scheduling terms. Basic deterministic scheduling algorithms have been observed. Heuristic algorithms have been classified that include breakdown and not include breakdown. Also four articles have been researched in this subject. A heuristic scheduling algorithm with n parallel machines under breakdown has been developed. Fitting of statistical data to distribution is used for calculating of intervals between breakdowns. Repair time is determined by using discrete probability distribution. This algorithm consist of three phase like assigning of the jobs to the machines, for each machine independently, optimization of the jobs to minimize number of setup and adding of breakdown times to existing schedule. Codes of the algorithm have been written by using VBA (Visual Basic for Application) with MS EXCEL interface. This developed algorithm has been applied to a real case as an experimental study. Improvements which have been observed from this study have been compared with previous case before optimization. In order to determine of the performance level of the algorithm, numbers of iterations and optimization times have been calculated for respectively 50, 100, 150, 200, 250, 300, 350 and 400 jobs. These data also visualized by graphically. Keywords: Multi-purpose scheduling, heuristic algorithm, parallel machines, breakdown, setup
Author
Mustafa Burak Boray
Institution
How to Cite
Mustafa Burak Boray (Master Thesis). Multi-purpose scheduling on parallel machines under breakdown, 2007, Yıldız Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Yıldız Technical University
- A ruled-based software model in the preliminary design phase of housing: Example of Mardin(2008)
- 19th-20th centuries apartment buildings in Şişli and Osmanbey(2001)
- An investigation on the relationship between problem solving and critical thinking skill, and academic achievement of vocational and technical high school students(2017)
- Numerical investigation of single bubble flow boiling both on a flat surface and on a cavity in horizontal pipe and pool boiling on a flat surface(2018)
- Examination of the categories in which buildings with LEED v3 and v4 certificates score the lowest points in Turkey(2018)
- Examining ?Historical housing structures" within the confines of protecting ecological balance(2012)
