Proje yönetiminde faiz oranları seçimi: Değişken faiz oranlarının kullanılma durumları
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
A study of existing and potential markets and of the technical and economical feasibility of a project, as well as sound finance planning, are indispensable. Economic profitability is the obvious and most important criteria for industrial project evaluation.The choice of interest rates in project management is the purpose of the thesis. The rate of interest should be adopted as discount rate in project evaluation. Because, the rate of interest reflects time preference and the opportunity cost of the possible alternative use of the capital invested. The interest rate is assumed to be constant during the project life in project evaluation techniques. In order to overcome this inability the constant rate should be replaced by time varying interest rates. uiSeveral forecast models aid project management to predict the valid interest rates in the evaluation. The thesis employs the expected-change forecast model to obtain interest rates for each year during the life cycle. An application of the model to one of the large-scale projects in the Armed Forces, namely modern self-propelled direct support artillery gun- SP2000, is presented in the thesis. Comparison of two alternative uses of interest rates in the calculation of net present value of the project is discussed. It is concluded that the constant interest rate use overstates the costs and it is suggested that the time varying interest rates should be adopted as the optimal discount rates in project management. Keywords: Project, Defense Industry, Interest Rate, Forecast Models
Author
Mustafa Kemal Topçu
Institution
How to Cite
Mustafa Kemal Topçu (Master Thesis). Proje yönetiminde faiz oranları seçimi: Değişken faiz oranlarının kullanılma durumları, 2002, İhsan Doğramacı Bilkent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İhsan Doğramacı Bilkent University
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
