Master'sOpen Access

Curtain wall (slurry trench) applications of Yedigöze dam and hydroelectric power plant

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2010
0 views
0 downloads

Abstract (EN)

Yedigoze Hydro Power Plant project is on a point of the Seyhan River at 28 km from the district center İmamoglu on the region of Mediterranean Region Adana (within the vicinity of Aladağ district). The project consists of dam building, up-downstream dams, derivation tunnels, spillway, penstock and water intake structures. Slurry Trench applications studied in this thesis involved in the project and evaluated.HES Yedigoze planned construction of housing where there are about 20 m thick alluvium. The alluvium was removed to elevation of 110 m bedrock elevation where hit concrete coating plinth the spring heel. On the other parts of dam remain under dam building, 5 m of stripping excavations on alluvium and slopes were done. Rock materials for fill dam were provided from limestone areas 7-9 km from the quarries of limestone rock material for infill housing is provided. Approximately 4 million cubic meters of rock will be used to infill housing. In this study, the necessary data for slurry trench applications for draining through the drying of the environment were collected and problems and results during application were revealed.

Author

Fatih Mehmet Nohut

How to Cite

Fatih Mehmet Nohut (Master Thesis). Curtain wall (slurry trench) applications of Yedigöze dam and hydroelectric power plant, 2010, Çukurova University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Çukurova University