Monitoring and analysis of power system components affecting overcurrent relay coordination
2023
0 views
0 downloads
Advisor: Dr. Öğr. Üyesi Ali Ünlütürk
Abstract (EN)
In terms of the reliability of relay coordination in Electricity Distribution Networks (EDN), the delay time of the opening contacts of Digital Overcurrent Protection Relays (DOCPR), the error rates of current transformers and the opening times of SF6gas circuit breakers are of great importance. For this reason, contact delays of protection relays, tripping time delays of breakers and turning ratio errors of current transformers must be tested periodically, and necessary maintenance and replacement must be carried out on equipment that makes faulty measurements. In this thesis study, real-time tests of different brands of DOCPR, different types of current transformers and different brands and models of SF6gas circuit breakers, which are widely used in EDN in Erzurum province, were carried out. After examining the effects of real-time test results on relay coordination, optimum overcurrent relay coordination was achieved by taking into account the delay time of the opening contacts of DOCPR and the opening time delay of SF6gas circuit breakers. In addition, the maximum fault current that the relays will encounter in possible 3-phase short circuit fault situations of each busbar have been determined by means of the Electrical Power System Analysis and Operation Software (ETAP Demo) in the power system model of EDN. Using this fault current data, the total operation time of the relays in operation was optimized with the help of optimization algorithms.Relay coordination of EDN is considered as a constrained optimization problem. Real-time test data was used in the defined relay coordination constraints of the EDN model. Later, the metaheuristic optimization algorithms Genetic Algorithm (GA), Antlion Optimization (ALO), Whale Optimization Algorithm (WOA), Salp Swarm Optimization (SSA), Circle Search Algorithm (CSA) and Honey Badger Algorithm (HBA) methods were used. As a result, the performances of the optimization algorithms used in obtaining the minimum total relay operation time were compared.
Author
Dr. İshak Özer
Institution
How to Cite
İshak Özer (Master Thesis). Monitoring and analysis of power system components affecting overcurrent relay coordination, 2023, Erzurum Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Erzurum Technical University
- Education in the Mardin Sanjak from Tanzimat to Republic(2015)
- Mothers and daughters in Turkish novel of the Tanzimat Period(2022)
- Mediating role of work force performance and organizational trust in the effect of empowerment on process innovation: A research in local governments(2023)
- Judith Butler and Feminism(2023)
- Experimental obtaining of modal behavior parameters of historical mosque minarats in Erzurum city center(2025)
- Inter-inscriptional comparison and phonetic continuity with Khakas Turkish in the vocabulary of old Turkic runic inscriptions(2026)
