In this study, Afşin-Elbistan B termal power plant, one of the most biggest termal power plant in Turkey which was built in Kahramanmaraş province Afşin-Elbistan region and has 4 x 360 MW production capacity, was investigated in terms of energy management systems. For this purpose, it was determined that boiler, condenser and heater are the components that cause major energy losses according to previous study that is performed with datas that are taken in every 3 minutes by SR EPOS (Energy Optimization System) program which is established in the plant. Levelized cost of electricity was calculated according to 3 different method for plant. Effect of the differences between the boiler efficiency which is calculated according to design parameters with the boiler efficiency which is calculated according to EPOS datas and boiler?s producer reference efficiency on levelized cost of electricity is calculated. As a result of this study it is determined that the levelized cost difference ,calculated over 20 years, arising from the boiler reaches 100 million$. Science Code : 914.1.038Key Words : Energy management system, Levelized cost of electricityPage Number : 75Adviser : Prof. Dr. H. Mehmet ŞAHİN

Author

Muhammet Saim Soysal

How to Cite

Muhammet Saim Soysal (Master Thesis). Investigation of energy performance of a thermal power plant according to the energy management systems, 2012, Gazi University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Gazi University