In this thesis, the ambient noise levels on the production panels and the preparation galleries, in addition to that personel noise and vibration exposure workers operating at these areas on the underground quarry where is produced by the barite production were measured. The risk assessment was made using the L type matrix method and the identified risks were grouped and analyzed according to their sources, levels and the severities.

Author

Dr. Rüştü Emre Tezölmez

How to Cite

Rüştü Emre Tezölmez (Master Thesis). Evaluation of noise and vibration exposures with risk assesment in underground barite plant, 2019, Çukurova University.