İnşaat projesinin nedenleri Irak'ta (Necef) gecikme
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
The construction sector holds significant importance within the setting of Iraq. It is well acknowledged that a significant proportion of construction projects in this country frequently have delays in meeting predetermined timelines and surpass intended budgets, often occurring simultaneously. The major aims of this Thesis are to investigate the impacts of building items deficiencies and to identify the primary factors contributing to these shortages in Iraq. To accomplish the aforementioned objectives, a comprehensive examination of existing literature and a survey methodology are employed. The survey requires key stakeholders involved in the advancement of infrastructure, housing, transportation, and healthcare initiatives to complete a questionnaire. The present survey possesses the capacity to be dissected into its constituent elements. The main aim of this study is to assess the influence of resource constraints on project delays by comparing them with alternative factors. The inclusion of the 20 criteria in the questionnaire has been derived after a meticulous examination of the pertinent scholarly sources. This study involved the participation of a sample of fifty individuals who are professionals in the construction sector. The sample included various roles such as managers, consultants, subcontractors, project engineers, and academic specialists. The subsequent section of the study aims to identify and assess the primary causes that contribute to shortages in materials. The aforementioned concerns can be categorized into four distinct groups, namely technological, experiential, managerial, and governmental. The analysis has two goals: first, to determine how important material shortages contrast with other explanations for delays, and second, to determine what factors are most responsible for shortages of materials. This thesis presents research that sheds insight on the causes of Iraq's looming shortage of construction materials. The closure of nearby material manufacturing facilities as a result of governmental rules, the lack of an adequate material managerial structure in building endeavours, And the lack of skilled owners or managers to oversee the current firms producing building materials are all contributing factors.
Author
Saeed Thamer Saeed Alnaserı
Institution
How to Cite
Saeed Thamer Saeed Alnaserı (Master Thesis). İnşaat projesinin nedenleri Irak'ta (Necef) gecikme, 2023, Altınbaş University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Altınbaş University
- The comparison of Samuel P. Huntington's "Clash of Civilizations" and Immanuel Wallerstein's "World Systems Analysis"(2024)
- The moderating role of self-efficacy in the effect of adverse childhood experiences on parenting attitudes(2025)
- Hastane mimarisinde fraktal boyutun bilinçli etkisi: Sıcaklık ve konforun artırılması(2024)
- Design of advanced anomaly detection system based on hybrid machine learning technique with optimized feature selection in wireless sensor network(2025)
- Kanser tedavisi amaçlı nano parçacıkların sentezi ve değerlendirilmesi(2025)
- Altı uzay öğrenme tabanlı tek sınıf sınıflandırma kullanılarak optimize edilmiş bir kötü amaçlı yazılım tespit tekniği(2023)