Project management and project management in civil engineering
2006
0 görüntülenme
0 i̇ndirme
Danışman: Yrd. Doç. Dr. Hüseyin Avunduk
Özet (EN)
ABSTRACTIn the past; engineers, architects or foremen were establishing themanagement of relatively small projects relying on personal knowledge andexperience. But in the 20th century large scale projects came up in parallel tothe technological developments. The establishment of these projectsrequired the coordination of several sub-projects, subcontractors, activities,manpower, material and equipment. These needs, respectively lead into theestablishment and development of GANTT, CPM, PERT techniques in projectmanagement.Project management can be defined as allocation of the presentresources to the activities (which have some sort of a relationship to eachother) generating the project in the best manner to attain the targets. Thesetargets can be defined generally as the completion of the project due to adeadline or money and time savings. With these techniques it?s possible toaccelerate or delay the projects, increase or decrease the costs and makefinancial planning. In conclusion the utilization of these methods in largescale projects will make significant contributions to the national economy.In this study the project management and project manager was toldand the process in the construction sector was shown with an applicationstudy.IV
Yazar
Dr. Özge Kolaylıoğlu
Bu Yayına Nasıl Atıf Yapılır
Özge Kolaylıoğlu (Master Thesis). Project management and project management in civil engineering, 2006, Dokuz Eylül University.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Dokuz Eylül University tezlerinden daha fazlası
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- Hittite period ceremonial ceramic vessels and current applications(2023)
- Examination of martian habitats from the viewpoint ofstructure(2022)
- Nesnelerin interneti cihazları arasındaki iletişim güvenliğinin arttırılması(2021)
- The thoughts and practises of Atatürk's adopted daughter Afet İnan(2018)
- Design and vision based control of a mobile manipulator(2008)