A new approach for mixed model assembly line balancing and worker assignment problem
2010
0 views
0 downloads
Advisor: Prof. Dr. Rızvan Erol
Abstract (EN)
In this study, an assembly line was considered which has workforce effect in addition to simple balancing problem. The problem which is defined as assembly line balancing and worker assignment problem, was tested two example problems and was applied a problem been in literature which has 58 operations. The problem was defined for an assembly line which has mixed model, deterministic operation times, known cycle time and multi skill workforce. Analytical approaches were investigated and the problems were solved by integer programming methods. For discovering behaviors of mathematical model were analyzed to scenario analysis under different conditions. Effect of cycle time length and workforce skill numbers were examined by scenario analysis.
Author
Dr. Yusuf Kuvvetli
How to Cite
Yusuf Kuvvetli (Master Thesis). A new approach for mixed model assembly line balancing and worker assignment problem, 2010, Çukurova University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Role of Anti-Mullerian Hormone (AMH) in ındicating the over reserve of IVF Patients(2011)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- Comparasion of the shear bond strength of two different precoated and uncoated ceramic brackets(2014)
- The control tests of four anode photomultiplier tubes for hf calorimeter of CMS detector(2014)
- The predictive strength of career decision making difficulties on high school students' career maturity accordi̇ng to their levels of focus of control(2017)
