Multi mode resource constrained multi stochastic project scheduling
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Nowadays, the business organizations in many sectors like aviation, construction and defense industry carry out multiple projects simultaneously by taking into account the usage of scarce resources. By adapting Resource Constrained Project Scheduling Problem (RCPSP) in a multi project environment, a research topic in the literature which is called Resource Constrained Multi-Project Scheduling Problem (RCMPSP) is created. The scheduling of activities in a multi project environment by considering precedence relationship and resource constraints is an important business management problem. Besides, business organizations have many different machines and equipment to do the same jobs. Since these machines and equipment can have new/old/various technologies, the same jobs can be completed with different cost rate and in various time frames. In real life, the duration of the activities in a project is not certain. Therefore, in this thesis, Multi-mode Resource Constrained Multi-project Scheduling Problem (MMRCMPSP) with stochastic activity duration is considered as a special case of RCPSP and modeled as Chance Constrained Programming (CCP). The goal is to determine the sequence and the schedule of all activities by keeping precedence relations and providing resource constraints under resource dedication (RD) policy so that the tardiness for each project is minimized. Since MMRCMPSP is NP–hard, a problem-specific Simulated Annealing (SA) algorithm is proposed to provide solutions for large-scale problem with no solution. SA algorithm is a stochastic search method that provides good solutions for optimization problems. Shortest Processing Time rule which is one of the sequencing rule based heuristic is suggested to generate initial solution. Besides, Combinatorial Auction (CA) method is used to solve RD problem. The effectiveness of our solution approaches is analyzed by computational analyses and the results are evaluated.
Author
Serdar Soysal
Institution
How to Cite
Serdar Soysal (Doctorate thesis). Multi mode resource constrained multi stochastic project scheduling, 2021, Başkent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Başkent University
- Classification of aircraft images(2025)
- A nietzschean reading of cormac Mccarthy's Blood Meridian Or the Evening Redness in the west and The Road(2021)
- An analysis of the alignment of English textbooks in Turkish primary schools with the 21st century skills(2025)
- The gastronomic heritage of tradesmen's restaurants: The case of Ankara(2025)
- The impact of vocational education on the skilled labor shortage: A study on the construction sector in Ankara province(2025)
- The effects of bankruptcy on litigation and follow-up processes(2019)
