Design stages of a grid-connected photovoltaic power plant and the importance of the power sizing factor
2022
0 görüntülenme
0 i̇ndirme
Danışman: Öğr. Gör. Göksu Görel
Özet (EN)
In this thesis, information about the installation stages of photovoltaic power generation plants is given and the effect of the inverter power sizing factor on production is examined over two different installed power plants. In order to determine the inverter power sizing factor, a study was carried out on the simulation program and the optimum inverter sizing factor was determined, and the effect of this factor on production was evaluated with real production data. In the study, first of all, information about renewable energy sources and their situation in Turkey is given. The systems that produce energy from the sun are briefly explained and the photovoltaic systems and the installation stages are given. Information about the laws and amendments regarding the renewable energy legislation is given. An algorithm for the determination process was created by explaining the inverter power sizing factor value. In the study, information about the characteristics of two power plants with the same characteristics in which the inverter power dimensioning value is examined is given, the calculations made and the steps followed are explained. Studies have been made on the PV*SOL simulation program with different inverter power dimensioning values and the system costs that these values will create are presented. The new power sizing factor value was determined by looking at the system cost and energy production. While the power sizing factor value was 1.166 when the system was first installed, it was determined as 1.40305 as a result of the simulation. In line with this value determined for System 1, a power increase of 20.33% was made. The production values of System 1 and System 2 were compared and it was observed that there was an increase of 13.83% in production.
Yazar
Abdussamed Balkan
Kurum
Bu Yayına Nasıl Atıf Yapılır
Abdussamed Balkan (Master Thesis). Design stages of a grid-connected photovoltaic power plant and the importance of the power sizing factor, 2022, Çankırı Karatekin Üniversitesi.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Çankırı Karatekin Üniversitesi tezlerinden daha fazlası
- The role of conservatism in women's participation in Türkiye's working life(2023)
- Tourism potential of Ankara province(2023)
- The role of ghrelin in overweight and obesity(2023)
- Evaluation of university staff's attitudes to gender roles (The case of Çankırı Karatekin University)(2023)
- The effect of pomegranate peel extract on some physical, chemical and microbiological properties of mesopotamian barb (Capoeta damascina) and yellow barbell (Carasobarbus luteus) fish fillets(2023)
- Ethics of war according to the Prophet (S.A.V.)(2023)