Performance comparison of the computer softwares used in the planning of construction projects on the basis of a project
2010
0 views
0 downloads
Advisor: Prof. Dr. Recep Kanıt
Abstract (EN)
This study aims to compare the activities belonging to a sample construction project and compare the datas of relations between activities, with the available project planning software MP [MS Project ]& MP [Primavera Project Planner], by using the parameters; early finish, late finish, critical path duration, activities on the critical path .On this purpose, the activities of a sample hospital project have been used and the priority relationship between activities have been identified. At later stages, these datas have been input to both softwares and outputs have been calculated. The selected comparison parameters have been taken as a result of software output and compared. As a result; on the basis of a project, the selected comparison parameters have given the same results on both software.Key Words : Project, project management, project planner, network analysis, CPM, PERT, MS-project, primavera
Author
Dr. Necla Keskinbaş
How to Cite
Necla Keskinbaş (Master Thesis). Performance comparison of the computer softwares used in the planning of construction projects on the basis of a project, 2010, Gazi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gazi University
- Occupational accident analysis and modelling in oil and gas drilling sector Turkey(2021)
- Experimental development of the interfacial bond-slip model between textile reinforced mortar strips and masonry walls(2025)
- XVI. yüzyıl Anadolu'sunda Oğuzların Karkın Boyu(2004)
- Deveplopment of semiconductor humidity sensors(2021)
- The effect of computer-assisted and direct strategy teaching on reading comprehension(2021)
- Sharing of real life geometry samples via a social learning environment: A case study(2021)