Planning construction projects with network diagrams and cost management
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
11 PLANNING CONSTRUCTION PRJECTS WITH NETWORK DIAGRAMS AND COST MANAGEMENT ( M.Sc. Thesis ) LATİF ONUR U?UR GAZİ UNIVERSITY INSTUTE OF SCIENCE AND TECHNOLOGY December 2003 ABSTRACT In this study, construction cost of Ankara Aşı Serum ve İlaç Kontrol Instute building is evaluated taking into account of work programs and manpower. In cases of taking back the construction completing time by %5, %10 and %15 earlier; manpower costs for each persentege ammount evaluated. For each time shortage a new work programme is prepared, manpower costs calculated, necessary programs worked out and time-cost comparision are made. During preparation of investment programme of this project different planning for different conditions are made and by making time, resource and cost analyses for each planning preference, the most racional one will be prefered in micro and macro scales. Science Code Key Words Page Number Adviser 966 Planning, Scheduling, Cost CPM, Gantt 97 Doç. Dr. Recep KANIT
Author
Latif Onur Uğur
How to Cite
Latif Onur Uğur (Master Thesis). Planning construction projects with network diagrams and cost management, 2003, Gazi University.
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gazi University
- Experimental development of the interfacial bond-slip model between textile reinforced mortar strips and masonry walls(2025)
- Occupational accident analysis and modelling in oil and gas drilling sector Turkey(2021)
- The ideological construction of regime debate in Turkey by the press in the context of 2007 presidential elections(2012)
- XVI. yüzyıl Anadolu'sunda Oğuzların Karkın Boyu(2004)
- Sharing of real life geometry samples via a social learning environment: A case study(2021)
- Evaluatıon of calcium hydroxide removal efficiency of two different irrigation activation techniques from artificial internal resorption cavities prepared at different root levels(2021)