Cost minimization in project management and a case study in construction sector
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
At the present time, conditions of competition forces firms to reduce their costs to win the tenders. Concerning project management decisions, cost is the most important factor. All Project managers wishes to complete their project withinsoonest time and minimum budget. In this regard, cost minimization on every stage of the project has became mandatory. Especially when calculating the budget on the planning stage, the ways for reducing the project costs shall be investigated.Therefore, lots of methods have been developed since 19th century. The methods are based on determining the project life time initially, have been developed to calculate the projects costs and still are very popular in Project management. The main goal of this study is to set forth the relation between project management, planning and cost minimization systems. In this direction, in the second chapter project, project constraints and project management concept were investigated; in the third chapter project management stages were touched on; in the fourth stage, Project management methods were told; in the fifth stage, the methods on minimization of project costs were touched on; in the sixth and last stage, the cost minimization of a project were shown in a virtual case study. In case study, Project management systems like CPM,PERT and Earned Value Analysis were used and the precautions to reduce the project cost that a project manager could take were discussed.
Author
Onur Kaplan
Institution

Yıldız Technical University
Division of Business Management
How to Cite
Onur Kaplan (Master Thesis). Cost minimization in project management and a case study in construction sector, 2012, Yıldız Technical University.
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Yıldız Technical University
- A ruled-based software model in the preliminary design phase of housing: Example of Mardin(2008)
- An investigation on the relationship between problem solving and critical thinking skill, and academic achievement of vocational and technical high school students(2017)
- Numerical investigation of single bubble flow boiling both on a flat surface and on a cavity in horizontal pipe and pool boiling on a flat surface(2018)
- Examination of the categories in which buildings with LEED v3 and v4 certificates score the lowest points in Turkey(2018)
- Examining ?Historical housing structures" within the confines of protecting ecological balance(2012)
- A strategic approach in the context of developing urban quality; the conceptual model proposal of urban design guideline(2015)