Examination of project management education within the scope of architecture programs in Turkey
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
While project management gains more importance day by day due to the increasing competitive environment in our world and in our country, it is very difficult to find a project manager who will manage projects in our country compared to other countries. In addition necessary importance is not given to the training and dissemination of project managers, it is thought that the project is managed with people who have not technically received management training. The aim of this study is to deal with project management and management through trainings within the scope of architecture programs in Turkey. For this purpose, undergraduate, postgraduate and doctorate education of all universities in Turkey, institutions and organizations that issue an international certificate for project management were examined. In the study, quantitive data collection was used as a method and then the information collected through literature review was analyzed and comments were made. In this direction, it has been determined that the number of project managers in our country is insufficient compared to the projects carried out in the sector, and it has been discussed that project management training should be more active and widespread, and as a result, the benefits brought to the sector are mentioned. This study is extremely important in terms of making project management more active and professional in Turkey.
Author
Gayenur Sevimli
Institution
How to Cite
Gayenur Sevimli (Master Thesis). Examination of project management education within the scope of architecture programs in Turkey, 2022, İstanbul Beykent University.
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İstanbul Beykent University
- The economic and social evaluation of the ones who have migrated from Turkey to Cyprus after 1974 in point of view of North Cyprus(2010)
- Eyyuhe'l-Veled translation(2018)
- No. 2 Muhimme Registry (963/1555) evaluation – transcription (S. 1-102)(2019)
- Investigation of the relationship between indecisiveness, resistance to change, and emotional self-efficiency in individuals aged 18-40(2022)
- A research on quality in urban spaces and urban design guides in the context of local identity(2017)
- Evaluation of pre-consumer waste in the Turkish ready-to-wear sector through sustainable design methods(2025)
