Determination of optimum pit limits of Afsin–Elbistan basin on (C) and (D) sectors
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
For a mining bed to be operated, the bed must first be modeled correctly. Modeling studies can be done using many different methods and applications. In this study, optimum annual production capacity conditions of Afşin–Elbistan Basin, (C) and (D) sectors were examined. In this direction, a solid model of this basin was constructed by using the data obtained from 52 cored drilling holes. Netcad/Netpromine software was used to constract the geological and solid model. Optimization module was used to estimate of net present values. As a result, if we select of 18,6 million tone of annual production capacity we will see the net present value is the maximum. The model, created is sensitive to annual inflation rate and saling price of coal.
Author
Oğuz Burak Ural
How to Cite
Oğuz Burak Ural (Master Thesis). Determination of optimum pit limits of Afsin–Elbistan basin on (C) and (D) sectors, 2018, Çukurova University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- An investigation of violent and nonviolent adolescent' families in terms in terms of family fuctioning, anger and anger expression(2006)
- Adolescents who have single parents family and full family were compared in respect to their life satisfaction and quality of life(2009)
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Cultural significance in foreign learning and teaching with special emphasis on reading comprehension through cultural schemata(1992)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- Investigation of psychological symptom levels in adolescents according to gender and family functions(2013)
