Planning of relocation of belt distribution center project using CPM the EÜAŞ/AEL
2007
0 views
0 downloads
Advisor: Doç. Dr. Suphi Ural
Abstract (EN)
Relocation activities of belt distribution point in Afşin ? Elbistan, Kışlaköy open cast mine (EÜAŞ) was analyzed using Critical Path Method (CPM). New belt distribution point consists of 6 belt conveyor lines comes from excavating site of the mine, 5 belt conveyor lines comes from dumping area and 2 belt conveyor lines go to coal stock pile. All the activities necessary to relocate belt distribution point is identified and the activities take place on the critical path were determined. Totally, 483 working days are needed to complete the project and any delay on these activities cause to extend project completion time. Key Words: Critical Path Method, Project Management, Open Cast Mine, Kışlaköy
Author
Dr. Mustafa Güneş
How to Cite
Mustafa Güneş (Master Thesis). Planning of relocation of belt distribution center project using CPM the EÜAŞ/AEL, 2007, Çukurova University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- A comprehensive study on indirect evaporative coolers: CFD-based performance analysis, geometric optimization and machine learning models(2025)
- Role of Anti-Mullerian Hormone (AMH) in ındicating the over reserve of IVF Patients(2011)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- Comparasion of the shear bond strength of two different precoated and uncoated ceramic brackets(2014)
- The control tests of four anode photomultiplier tubes for hf calorimeter of CMS detector(2014)