Computer aided planning method in the construction sektor
2016
0 görüntülenme
0 i̇ndirme
Danışman: Prof. Dr. Ömer Keleşoğlu
Özet (EN)
In the introduction the first part of my thesis Imade; were mentioned construction sector the largest share of the developments in the technological and scientific fields and the continuous renewal growth rate of public sector in Turkey. In the second parthas emphasized importance of the project mentioning project,Project Management and Project Management component. In the third part; The work we have to complete with in a certain period of time and tok now how to do what ever suffered fromin order; Planning under planning methods, the programming and planning techniques are discussed giving examples of the method of application of these techniques. In the later part of the study, work programme of 6 block cooperative construction has been prepared with helping P6R8.4 explaining the use of Primavera P6 job programme.
Yazar
Dr. Tuba Torğut
Bu Yayına Nasıl Atıf Yapılır
Tuba Torğut (Master Thesis). Computer aided planning method in the construction sektor, 2016, Fırat University.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Fırat University tezlerinden daha fazlası
- Color usage at Turkish Divan of Fuzûlî(2013)
- Comparison of element concentrations in crude oil samples taken from different sites in Iraq and Turkey(2021)
- A grammatical study on a Kırghız author Cengiz Aytmatov's novel named as "Deñiz Boyloy Cortqon Ala Döböt" (Introduction-analysis -text)(2021)
- Geometric properties of Hasimoto surfaces in Minkowski 3-space(2022)
- The world of poetry by Hidayet Karakus(2022)
- The relations between land use with geomorphological features of hani environment (Diyarbakır)(2022)
