Evaluation of building information modeling (BIM) in construction management

2021
0 görüntülenme
0 i̇ndirme
Danışman: Dr. Öğr. Üyesi Nuray Benli Yıldız

Özet (EN)

Building sector has many divided stakeholders such as materials, product providers, millions of customers, service providers, end users. It is known that the effect of deficiencies and errors on the construction cost is an additional 25-30%. Therefore, when the construction works are evaluated from the point of view of the investor, making a profit from the work done and the short depreciation period of the structure have become the first priority. The short period of redemption also depends on the main factors such as the consistent drawing of the projects, the completion of the building on time, the absence of work accidents, the timely and correct amount of material orders, the error-free production, the absence of returns in the productions, and the production of structures suitable for the project. These situations have forced architects and engineers to develop more innovative methods and technologies. At the last point, the concept of Building Information Modeling (BIM) has come to the forefront. BIM includes all the processes from the design of a building to the completion of its life and disposal. In this study, the effects of not using BIM in construction management from tender to final acceptance in construction works are discussed. As the main subject of study, the effect of using BIM on time and cost in buildings has been examined. In the study, the results were obtained by compiling the field data and reaching the numerical figures in the light of the findings. Six field studies were examined as examples and for each example, evaluations were made in the light of the concrete data obtained from the beginning to the end of the work. According to the findings, the areas where the most mistakes are made appear as the quantity errors in the tender files, the cubage and excavation calculation errors, the type and quantity errors in the material order, the errors in production conflicts between professional disciplines and the errors made in the progress payments. BIM-based improvements that can be made in these areas have provided the opportunity to save between 7-15% in time and between 2-20% in cost. It is aimed to provide benefits to stakeholders who undertake different tasks such as administration, contractor and employer in the public and private sectors by identifying the errors that may occur in construction from the beginning with BIM. Keywords: Building Information Modelling (BIM), Collision analysis Construction management, Quantity

Yazar

Dr. Emrah Kuytan

Bu Yayına Nasıl Atıf Yapılır

Emrah Kuytan (Master Thesis). Evaluation of building information modeling (BIM) in construction management, 2021, Düzce University.

Anahtar Kelimeler

Lisans

Tüm Hakları Saklıdır

Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.

Düzce University tezlerinden daha fazlası