Master'sOpen Access

Applications of excavation and reinforcement in the 4. Levent- Ayazağa (İstanbul) tunnel

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2009
0 views
0 downloads

Abstract (EN)

This work which has been planned by Istanbul Manucipility and done by Garanti Koza A.S. and Aslim-Alarko coorperation, has been applied for New Australian Tunnel Method (NATM) to the Project of 4.Levent-Ayazaga part connection tunnels and depot area constructions of Istanbul subway.The aim of this work is to realize factors and application methods depending on spent time in a NATM circle. In this study, general information has firstly been given and it has been explained the history of the subway and previous works. To determine engineering features of rock soils, `Umbrella Arch? (UA) method has been improved. The classification of the tunnel for engineering way has been utilized.

Author

Emre Süzen

How to Cite

Emre Süzen (Master Thesis). Applications of excavation and reinforcement in the 4. Levent- Ayazağa (İstanbul) tunnel, 2009, Çukurova University, Maden Mühendisliği Bölümü.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Çukurova University