Effective project management in drinking water treatment facilities: Case of Ordu Gölkoy Drinking Water Treatment plant
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In order to meet the needs of large settlements and high population, increasingly amount of drinking water needs to be treated in effective and efficient plants which are qualified and reliable. In this study, it is examined how the project management based on the optimum process selections of drinking water treatment plants that can work more effectively and efficiently to meet this need. By utilizing the current legislation, specific to Gölköy and Gürgentepe Drinking Water Treatment Plants, project management stages are examined in the context of scope, communication, budget, time, supply chain, human resources, risk, quality, stakeholder, and integration. In addition, effective project management is examined by making situational analyses in terms of risk assessment with the Fine Kinney Method in terms of capacity utilization rate, occupational health and safety, evaluation of the treatment efficiency of the plants over the years, calculation of the current construction-mechanical and electricity costs, evaluation of cost analyses based on time of construction and operating costs, and renewal or optimization of existing drinking water treatment plants. Moreover, in the new projects, it is aimed to choose the optimum process based on the current regulations and to ensure efficient project management in order to use public resources effectively and efficiently. It is considered that the project managements will provide insight and benefit in terms of more effective and efficient use of limited economic resources by conducting a situation analysis during the renewal or optimization of existing plants. Keywords: Fine Kinney Method, Drinking water treatment plant, Optimization, Project management, Work program in project management
Author
Mustafa Karagöz
How to Cite
Mustafa Karagöz (Master Thesis). Effective project management in drinking water treatment facilities: Case of Ordu Gölkoy Drinking Water Treatment plant, 2023, Gümüşhane University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gümüşhane University
- RÜZGAR ENERJİSİ SANTRALİ İÇİN YER SEÇİM ANALİZİ: GİRESUN İLİ ÖRNEĞİ(2026)
- Performance evaluation of deep learning models for intrusion detection using network traffic(2026)
- GÜMÜŞHANE DEVLET HASTANESİNDEKİ HEMŞİRELERİN AFET TEHDİDİ İÇİN PSİKOLOJİK HAZIRLIKLARININ BELİRLENMESİ(2026)
- Petrography and mineral chemistry of the Gölönü pluton (Kürtün-Gümüşhane-Türkiye)(2026)
- Validity and reliability study of a Turkish version of the knowledge and attitudes towards antibiotic resistance(2026)
- Occurrence and infestation status of mistletoe (Viscum album L. ssp. austriacum) in Scots pine forests: The case of Olur Forest Sub-District Directorate(2026)
