The project management approach in the enterprise resource planning system integration process and a company study
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
The Success of Enterprise Resource Planning (ERP) depends not on the size of budget but adequate preparation and proper project management. Otherwise, inadequate preparation process and incorrect project management cause devastating results. All projects relevant to Information Technologies (IT) delicate to changes in the business enviroment and pace of change in the global business world generates demands of enterprise systems such as Enterprise Resource Planning (ERP). At the same time, system success depands on the punctiliousness of project management processes. Shift in scopes, poor risk management, insufficient allocation of human resources over time and vendor management are some common problems with the implementation of an operating system. In this research, project management approach was examined and practice during the Enterprise Resource Planning systems implementation.
Author
Didem Açıkalın
Institution
How to Cite
Didem Açıkalın (Master Thesis). The project management approach in the enterprise resource planning system integration process and a company study, 2019, Dokuz Eylül University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Dokuz Eylül University
- Analysis of speech clarity parameters in open plans offices(2021)
- The characteristic of rural architectural heritage and the conservation problem in Urla region(2019)
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- New suggestions regarding the technical problems encountered by proffessional vocal artists in voice production(2012)
- Examination of martian habitats from the viewpoint ofstructure(2022)
- Environmental graphic design and public installation in the context of 21st century postmodernism(2022)
