Determination of optimum pit limits of Afsin–Elbistan basin on (C) and (D) sectors
2018
0 görüntülenme
0 i̇ndirme
Danışman: Prof. Dr. Ahmet Mahmut Kılıç
Özet (EN)
For a mining bed to be operated, the bed must first be modeled correctly. Modeling studies can be done using many different methods and applications. In this study, optimum annual production capacity conditions of Afşin–Elbistan Basin, (C) and (D) sectors were examined. In this direction, a solid model of this basin was constructed by using the data obtained from 52 cored drilling holes. Netcad/Netpromine software was used to constract the geological and solid model. Optimization module was used to estimate of net present values. As a result, if we select of 18,6 million tone of annual production capacity we will see the net present value is the maximum. The model, created is sensitive to annual inflation rate and saling price of coal.
Yazar
Oğuz Burak Ural
Bu Yayına Nasıl Atıf Yapılır
Oğuz Burak Ural (Master Thesis). Determination of optimum pit limits of Afsin–Elbistan basin on (C) and (D) sectors, 2018, Çukurova University.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Çukurova University tezlerinden daha fazlası
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- A comprehensive study on indirect evaporative coolers: CFD-based performance analysis, geometric optimization and machine learning models(2025)
- Kazal's of Moldo Kılıç (Phonetical, morphological studies - text-translation)(1998)
- Toplam kalite yönetimi ve Çukurova bölgesindeki tekstil işletmelerindeki uygulamaları(1998)
- A Model for effective supervision from the supervisor and the student-teacher`s perspective: A social constructivist approach(2003)
