Risk assessment of kargi hydropower plant project tunnel related occupational health and safety
2019
0 görüntülenme
0 i̇ndirme
Danışman: Prof. Dr. Ahmet Mahmut Kılıç
Özet (EN)
In the improving Technologies tunnelling works gets faster in energy and transportation field. As known construction and mining works can be accepted as the most dangerous profession. Tunnelling works are the combination of mining and construction which can be classified as most hazardous works. In this study risks assessed of Kargı Hydropower Plant Tunnel construction and possible risks are evaluated. L Type Matrix used for risk assessment. Precautions defined about risks and hazard management.
Yazar
Ahmet Yılmaz
Kurum
Bu Yayına Nasıl Atıf Yapılır
Ahmet Yılmaz (Master Thesis). Risk assessment of kargi hydropower plant project tunnel related occupational health and safety, 2019, Çukurova University.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Çukurova University tezlerinden daha fazlası
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- A comprehensive study on indirect evaporative coolers: CFD-based performance analysis, geometric optimization and machine learning models(2025)
- Kazal's of Moldo Kılıç (Phonetical, morphological studies - text-translation)(1998)
- Toplam kalite yönetimi ve Çukurova bölgesindeki tekstil işletmelerindeki uygulamaları(1998)
- A Model for effective supervision from the supervisor and the student-teacher`s perspective: A social constructivist approach(2003)
