Master'sOpen Access

Determination of reserve and exploitation method of Kizilyüksek cromite ore (Aladağ)

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

2009
0 views
0 downloads

Abstract (EN)

In this study, reserve and tenor calculation, suitable operation and production methods, open pit and underground operation have been trying to decide of ore deposite of Kızılyuksek chromite modeling with program Micromine 11.0. The importance of decided operation and production methods is touched. Modeling is very important about operating large ore deposite which low tenor, low reserveand/or high reserve. Three-dimensional modeling ore bed, operation design and production methods are evaluated separately on the three mines at the ore deposite of Kızılyuksek chromite.

Author

Metin Akyol

How to Cite

Metin Akyol (Master Thesis). Determination of reserve and exploitation method of Kizilyüksek cromite ore (Aladağ), 2009, Çukurova University, Maden Mühendisliği Bölümü.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Çukurova University